Project Description
A Sprockets
Products information
1.Brand:CC.
2.Material: Polyamide PA6.
3.Model identification:machined driving/idler sprockets-chain’s code-teeth-bore.
4.Performance characteristics:machined,can be used in heavy load transport,matching well、high precision、good strength.
Specification
Code | Teeth No | PD(mm) | OD(mm) | Bore(mm) |
1-A-8-25 | 8 | 132.7 | 130 | 25 |
1-A-8-30 | 30 | |||
1-A-8-40 | 40 | |||
1-A-10-25 | 10 | 164.4 | 161.7 | 25 |
1-A-10-30 | 30 | |||
1-A-10-35 | 35 | |||
1-A-10-40 | 40 | |||
1-A-12-25 | 12 | 196.3 | 193.6 | 25 |
1-A-12-30 | 30 | |||
1-A-12-35 | 35 | |||
1-A-12-40 | 40 | |||
1-A-14-30 | 14 | 228.3 | 225.9 | 30 |
1-A-14-35 | 35 | |||
1-A-14-40 | 40 | |||
1-A-14-45 | 45 |
Products information
1.Brand:CC.
2.Material: Reinforced PA+fiber.
3.Model identification:mould driving/idler sprockets-chain’s code-teeth-bore.
4.Performance characteristics:plastic injection moulding,can be used in heavy load transport,matching well、high precision、good strength.
Specification
Code | Teeth No | PD(mm) | OD(mm) | Bore(mm) |
3-A-8-25 | 8 | 132,7 | 130 | 25 |
3-A-8-30 | 30 | |||
3-A-8-35 | 35 | |||
3-A-8-40 | 40 | |||
3-A-8-40*40 | 40*40 | |||
3-A-10-25 | 10 | 164.4 | 161.7 | 25 |
3-A-10-30 | 30 | |||
3-A-10-35 | 35 | |||
3-A-10-40 | 40 | |||
3-A-10-50*50 | 50*50 |
Application scenario:
FAQs:
Q: What kind of payment do you accept?
A: Generally, 30% deposit should be paid when placing an order, and the balance should be paid before shipment
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Can you manufacture goods with our own designs?
A: Of course, we can provide you with customized services, OEM, ODM, as well as sample and drawings production services.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment.